Wholesale Dealers Of Z Boom Concrete Pump - 100 Car Pump Ultra Long Distance Transport – Jinzhongzun Detail:
Description
The European fashion design concept is adopted to make the product look beautiful, fashionable, smooth and humanized.
All these have brought exciting choices to customers, and at the same time, the convenience of operation and maintenance has been greatly improved.
Careful attention to every detail ensures that the products rank first in the domestic market with the best quality and are in a leading position in the world.
The lubrication system adopts automatic multi-point lubrication technology, one-to-one lubrication, with better performance and longer service life of vulnerable parts. The electrical components come from Schneider and LG, and the reliability of the electrical control system has been greatly improved.
The cylinder seals are made by Parker. The S pipe valve is integrally cast with high manganese steel, and the wear surface is welded with wear-resistant materials, which has dual advantages of high pressure resistance and wear resistance. The spectacle plate and cutting ring are made of hard alloy inlay, which is durable. Piston: The piston is made of imported materials by precision processing. It has excellent qualities of hydrolysis resistance, wear resistance and high temperature resistance.
Automatic protection technology: diesel engine startup protection, electrical system fault and short circuit protection, diesel engine automatic protection when water temperature is too high and oil pressure is too low, diesel engine speed limit protection, quick stop button.
More reliable service quality, thus saving your costs. We have a high-quality after-sales service team, rich knowledge and experience, complete equipment, ready to provide services for your equipment.
ITEM | UNIT | SPECIFICATION | |||
Model | HBC80 | ||||
Driving system | Chassis brand/ model | FAW Jiefang | |||
Fuel type | Diesel | ||||
Tyre model | 9.00 | ||||
Axle base | m | 4.2 | |||
quantity of axles | 2 | ||||
Max. driving speed | Km/h | 100 | |||
wheel base(front/back) | mm | 1530/1600 | |||
Pumping system | Brand of diesel engine | Yuchai engine | |||
Diesel engine power | KW | 181 | |||
Driving mode | Hydraulic driving | ||||
Main pump | Korea Handock | ||||
Oil cylinder inner diameter × stroke | mm | Ф125×Ф80×1200 | |||
Concrete cylinder inner diameter × stroke | mm | Ф230×1450 | |||
Oil pressure of system | MPa | 32 | |||
Switch of H-pressure and L-pressure | Equipped | ||||
Theoretical pumping pressure | Mpa | H-pressure | 16 | ||
Mpa | L-pressure | 10 | |||
Theoretical pumping frequency | times/min | H-pressure | 8 | ||
times/min | L-pressure | 18 | |||
Theoretic Pumping distance | m | Max. Vertical | 120 | ||
m | Max. Horizontal | 300 | |||
Fuel tank capacity | L | 180 | |||
Hydraulic Oil tank capacity | L | 200 | |||
Cooling mode of hydraulic system | Fan cooling | ||||
Max. theoretical capacity | m3/h | H-pressure | 60 | ||
m>3/h | L-pressure | 80 | |||
Pumping distance (H-pressure) | Max. Horizontal | m | 125A pipe | 300 | |
Max. Vertical | m | 125A pipe | 120 | ||
Hopper capacity | m3 | 0.6 | |||
Feeding height | mm | ≤1300 | |||
Concrete slump | cm | 14~23 | |||
Max. aggregate diameter | mm | Crushed stone:40 / Pebble:50 | |||
Valve | S Valve | ||||
Lubrication mode | Automatic | ||||
Overall dimension | Total Length×total Width×total height(mm) | mm | 7200×2100×2750 | ||
Full-load total weight | Kg | 12500 |
Product detail pictures:
Related Product Guide:
With our loaded practical experience and thoughtful solutions, we now have been identified for a trusted provider for numerous intercontinental consumers for Wholesale Dealers Of Z Boom Concrete Pump - 100 Car Pump Ultra Long Distance Transport – Jinzhongzun, The product will supply to all over the world, such as: Tajikistan, Pakistan, Bandung, We are increasingly expanding our international market share based on quality products, excellent service, reasonable price and timely delivery. Please contact us at any time for more information.
By Chris from Poland - 2017.08.18 11:04
Problems can be quickly and effectively resolved, it is worth to be trust and working together.
By Ricardo from Liverpool - 2018.06.26 19:27